top of page
01302 821068
All Posts


Refuse Vehicle Full Rebuild: Blasted, Primed and Protected
When a refuse vehicle body comes into the workshop, it’s rarely a light tidy-up job. These units work hard, day in, day out. Exposure to waste, moisture, road salt and constant loading takes its toll. This latest project was a full rebuild , starting with a complete body strip-down and blast back to bare metal. Back to Bare Metal The first stage was shotblasting the entire body to remove corrosion, surface contamination and years of wear. This is where the real work happens.
The Refurb Report
Feb 202 min read


Full Vehicle Rebuild: Cab, Body and Tanker Installation
This bespoke tanker build is a great example of what can be achieved when we take on a full vehicle transformation. The job involved refurbishing both the cab and the body of this Iveco vehicle, followed by the installation of a brand-new PTO system and bespoke tanker setup. As always, the prep and paint were completed to a high standard, with the final finish both durable and consistent across the whole unit. From a tired commercial vehicle to a purpose-built piece of equipm
The Refurb Report
Jan 161 min read


Bold New Look: Volvo Cab Colour Changes That Stand Out
Colour changes aren’t just cosmetic , they make a statement and these Volvo cab repaints are a perfect example of what a bold colour refresh can do. We recently completed several cab resprays for a long-standing customer, with each Volvo unit receiving a completely new exterior finish. From muted factory tones to something far more striking, these cabs now stand out for all the right reasons and it wasn’t just about paint. It wasn’t just about paint. Every inch was properly p
The Refurb Report
Dec 19, 20251 min read


Bulk Dumper Refurbishment: 12 Machines, One Standard of Quality
Twelve site dumpers in, twelve site dumpers out — all looking the part and ready for more hard graft. This recent project saw a full batch of dumpers through our workshop for refurbishment. Each one was given the attention it deserved: carefully prepared, primed, and professionally painted to restore appearance and add real longevity. As winter draws in, conditions on site get harsher — damp, mud, salt and grit can all accelerate wear and corrosion. That’s why now is the idea
The Refurb Report
Nov 21, 20251 min read


Full Rebuild: Fruehauf Bulk Trailer Chassis Refurbishment
This Fruehauf bulk trailer chassis came to us looking well past its best — rusted, faded, and clearly in need of attention. The owner needed more than just a tidy-up. They needed a full, professional job that would stand up to the demands of daily use. We began by fully shotblasting the chassis to remove layers of corrosion and bring it back to bare metal. From there, it was primed and professionally repainted using durable 2K paint for a hard-wearing, gloss finish that will
The Refurb Report
Oct 17, 20251 min read


Repainted and Ready: A Full Paint Refresh for This Kubota Excavator
At Re-Fit, we specialise in making machinery look as good as it performs — and this Kubota KX080-4a is a great example of what a full...
The Refurb Report
Sep 19, 20251 min read


The Finishing Touch – Professional Paint & Finishing Services at Re-Fit
At Re-Fit, we know that presentation matters just as much as performance — especially in the world of construction, plant, and...
The Refurb Report
May 16, 20252 min read


Brought Back to Life: JCB JS131 Fully Refurbished by Re-Fit
At Re-Fit, we specialise in transforming tired, worn-out plant into fully refurbished, reliable machines that are ready to go straight...
The Refurb Report
Apr 17, 20252 min read


Breathing New Life into Crawler Cranes: A Re-Fit Refurbishment Success Story
At Re-Fit , we believe that machinery doesn't have to be replaced to perform like new. Our comprehensive refurbishment services are...
The Refurb Report
Mar 21, 20252 min read


The Smart Way to Extend the Life of Your Machinery
Introduction: The True Cost of New Equipment Buying new machinery can be one of the biggest expenses for construction and industrial...
The Refurb Report
Feb 28, 20252 min read
bottom of page
