top of page

Bulk Dumper Refurbishment: 12 Machines, One Standard of Quality

  • The Refurb Report
  • Nov 21
  • 1 min read
ree

Twelve site dumpers in, twelve site dumpers out — all looking the part and ready for more hard graft.

This recent project saw a full batch of dumpers through our workshop for refurbishment. Each one was given the attention it deserved: carefully prepared, primed, and professionally painted to restore appearance and add real longevity.


As winter draws in, conditions on site get harsher — damp, mud, salt and grit can all accelerate wear and corrosion. That’s why now is the ideal time to protect your fleet and give it a proper refresh.


From weathered and worn to smart and site-ready, every dumper in this batch left our doors ready to face the tougher months ahead.


ree

What We Delivered:

  • Full prep work on all 12 dumpers

  • Primed and repainted in hard-wearing 2K coatings

  • Consistent finish across the fleet

  • Quick turnaround, no corners cut


It’s not just about looks. A clean, freshly painted dumper lasts longer, holds its value, and reflects well on your business.


ree

Did You Know?

Dumper fleets that are regularly maintained and professionally refinished tend to last up to 40% longer than those left to deteriorate — especially during the cold, wet winter months.


Get Your Fleet Winter-Ready

If your dumpers are starting to show their age, now’s the time to act. Give them the treatment they need — and keep them working, looking and lasting better through winter and beyond.


Give us a call to book in.

 
 
 

Comments


bottom of page